.
POWER-MAX ...... Electrical energy-saving products

Home Page

How to install the power-max

Wind and Sunlight Links

How To Change A Breaker

Electricity Basics

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Save Up To 25% On Your Electric Bill.........

How To Install The POWER-MAX
(to down load complete installation instructions... click here)

Prior to removing breaker panel cover MAKE CERTAIN THE MAIN BREAKER IS IN THE “OFF” POSITION.  The power should remain “OFF” until the entire installation is complete.


 

Remove the breaker panel cover by unscrewing the 6 (or on some panels 8) screws on the perminiter of the panel.  Pull the panel straight back so as not to "flip" any breaker back on or off.


 

Once the cover panel is removed, use a multi-meter to check that there is no voltage!  Put the red probe on a breaker terminal and the black probe on the ground bar.  You should have a voltage of zero!  (you may get a voltage of 1 or 2 volts... but this is normal)


 

Using a screw driver and hammer, knock out a 1/2"  "knock out" in the bottom of the breaker box.  


 

Cut a 1" BY 1" Slit in the sheet rock adjacent to the "knocked out" hole.  Install the 90 degree adapter (with conduit attached) into the knocked out hole.  Secure adapter with washer and nut supplied .


 

Snake 3 wires from power-max through conduit (remember to slip nut, washer and sleeve over/on conduit).  Once you snake wires, pull power-max up to conduit and twist sleeve onto conduit and tighten washer/nut to power-max.  At this point, you can let the power-max hang free while you complete installation.


 

Mark mounting holes so the power-max is level and conduit is not "kinked".  Using screws or nylon sheet rock anchors, mount the power-max.


 

Install a 20amp, 2 poll, 230volt breaker in an open spot.  If your panel is full, you can purchase mini breakers (2 - 15 or 20 amp breakers) and combine the old style larger breakers to free up space.


 

Install the the "red" wire on the top terminal of the new 20amp, 2 pole breaker and the black wire to the bottom terminal.


 

Now run the "green" wire to the ground bar.  A ground bar is located on both side of the panel (usually).


 

Turn power (main breaker) back on. Flip the “dedicated” two pole breaker to “ON” and check that the indicator light is on. This will indicate that the unit is working and installation is complete.


If the light is “not” on turn power off, and check to make certain proper and secure contacts are made with the red wires and the breaker, and the green wire and the ground bar. Install cover, turn power back on, and check light again.


 

For Sales, Service and Installation Contact Larry @ (772) 532-0616